Project Timing
- Start
Mar
14
2021
- End
Mar
20
2021
Overall Project Completion
100%
Poster Promosi Cafe Fave
100% Complete
7/7 Tasks completed
-
Research
-
Design
-
Masukan Details
-
Design Saiz Ig
-
Design Saiz Google
-
Confirm kan Dengan Wawa
-
Ubah Details
Gambar Potong IG
100% Complete
3/3 Tasks completed
-
Gambar Potong 3 Catering
-
Gambar Potong 6 Catering
-
Gambar Potong 3 Tasik
Design Poster 3 Coming Soon D tasik IG
100% Complete
6/6 Tasks completed
-
Research
-
Design 1
-
Design 2
-
Masukkan Details
-
Consult Dengan Wawa
-
Design Potong 3
Edit Menu Sementara Cafe
100% Complete
3/3 Tasks completed
-
Tambah Waktu Beroperasi
-
Buang Menu yang Tiada
-
Letak Logo Cafe